Der Sportwagen

DSW2015 May-June

Issue link: http://www.e-digitaleditions.com/i/506091

Contents of this Issue

Navigation

Page 14 of 45

May / June 2015 15 Below are the two halves of the crankshaft carrier. We are setting the main bearings into the carrier. There are also a pair of thrust washers that insert in the center, but I seem to have skipped over a picture that would show those. These bearings limit the forward/aft movement of the crankshaft. With the bearings lubricated with assembly grease, the crankshaft is lowered into the carrier half, and then the other half is installed on top. And we end up with a crankshaft along with 3 connecting rods installed in the carrier. The connecting rods are interesting technology utilizing cracked cap rods. Rather than having two smooth machined halves of the rod end, instead, the rods are cast as one piece, then cracked in half to create the two pieces. If you look at the picture closely, you will see the jagged edges of the two halves. This allows for a higher strength rod as the uneven surfaces fit more securely together than two flat planed halves. Next is to attach the intermediate shaft to the crankshaft. Here you can see the IMS is connected to the crankshaft via a chain, and the IMS then has two chains (one has ENGINE ANATOMY: M96/M97 PART 1

Articles in this issue

Archives of this issue

view archives of Der Sportwagen - DSW2015 May-June