for the entranceway," Miller says. "It's beautiful,
but that granite is difficult to work with because
of its extreme hardness." Nevertheless, much of
the stone was cut and repurposed as the stair-
way leading to the front door and other parts
of the structure.
Completed in 2014, the main house compris-
es 7,101 square feet and contains four bed-
rooms, 3.5 bathrooms plus a detached three-car
garage. "On this project we were able to design
and build bespoke sinks, staircases and other
appointments," the architect explains. "If we
couldn't find the perfect piece, we made it."
For instance, all the window glass that
136
C A R M E L M A G A Z I N E • H O L I D A Y 2 0 1 6
Highest Quality Workmanship, on Schedule,
within Budget.
21 W. Carmel Valley Road
Carmel Valley, CA 93924
Tel (831) 659-5881
Fax (831) 659-5882
www.Regencyconst.com
www.rwhassociates.com
Under construction. Coming soon
Miller defines Pelican House as a "modern" design, utilizing advanced systems and
solutions and stretching the limits of what can be done with them.