Carmel Magazine

CM Nov 1, 2016 Barrymore HO16_DigitalEdition

Issue link: http://www.e-digitaleditions.com/i/748197

Contents of this Issue

Navigation

Page 137 of 219

for the entranceway," Miller says. "It's beautiful, but that granite is difficult to work with because of its extreme hardness." Nevertheless, much of the stone was cut and repurposed as the stair- way leading to the front door and other parts of the structure. Completed in 2014, the main house compris- es 7,101 square feet and contains four bed- rooms, 3.5 bathrooms plus a detached three-car garage. "On this project we were able to design and build bespoke sinks, staircases and other appointments," the architect explains. "If we couldn't find the perfect piece, we made it." For instance, all the window glass that 136 C A R M E L M A G A Z I N E • H O L I D A Y 2 0 1 6 Highest Quality Workmanship, on Schedule, within Budget. 21 W. Carmel Valley Road Carmel Valley, CA 93924 Tel (831) 659-5881 Fax (831) 659-5882 www.Regencyconst.com www.rwhassociates.com Under construction. Coming soon Miller defines Pelican House as a "modern" design, utilizing advanced systems and solutions and stretching the limits of what can be done with them.

Articles in this issue

Links on this page

Archives of this issue

view archives of Carmel Magazine - CM Nov 1, 2016 Barrymore HO16_DigitalEdition