Ameripointe Logistics Hub

Ameripointe Logistics Hub Overview

Issue link: http://www.e-digitaleditions.com/i/880802

Contents of this Issue

Navigation

Page 11 of 13

Industrial Electricity Level Customer Charge Capacity Charge Energy Charge Level 1 (above 50 kv) $300 per month Summer max demand $9.48 Winter max demand $4.56 First 1 million kWh per month $.0392 per kWh All additional kWh per month $.0362 per kWh Natural Gas Ardmore (Oklahoma Natural Gas Co.) Standard rates are available based upon location and delivery volume requirements. Rates are available for delivery only as well as delivery and commodity (www.ong.com). Water 10,000 Gallons 100,000 Gallons 400,000 Gallons Cost $65.98 $323.76 $763.76 Sewer 10,000 Wastewater Gallons* 100,000 Wastewater Gallons* 400,000 Wastewater Gallons* Commercial/Industrial Cost Based on 1.0" Meter (Cost varies by meter size) $68.27 $317.75 $1,149.35 *A wastewater gallon is equal to 90% of an incoming water gallon for purposes of wastewater billing, unless measured with an approved volume device. On-Site Fire Department

Articles in this issue

Links on this page

view archives of Ameripointe Logistics Hub - Ameripointe Logistics Hub Overview