July/August/September 2019 I 37 The commissioning agent should review contractor submittals along with the design professionals to verify that the submitted equipment meets the intent of the basis of design documents. The design professionals should provide the final submittal response after consultation with the commissioning agent. The Prior to occupancy, the access control, integrated systems and life safety systems must be tested in accordance with the approved commissioning report. Test equipment calibration should be up to date and performed by an independent testing laboratory. Testing should include: • Conformance to all approved drawings and specifications. Any deviations from the construction documents must be noted and documentation of the approval for these changes included in the final report • Compliance with manufacturers' installation instructions • Compliance with codes and AHJ requirements • Review of material and equipment submittals for proper ratings for use • Coordination of all contractors' submittal drawings, sequences of operation and approved change orders • Verification of passing both integrated and individual system functional testing (Figure 5). The testing team must have a working knowledge of the integrations between systems for which the testing is being performed. Testing should be witnessed by a party who represents the owner and is present to protect the owner. The commissioning plan should be reviewed for completeness and accuracy. 5. CONTRACTOR SUBMITTALS 6. INSPECTION AND TESTING commissioning agent will keep a copy of the contractor submittals to verify that the installed materials comply with the submittal and manufacturers' installation instructions. These submittals will then be included in the commissioning report. Prior to occupancy, the access control, integrated systems and life safety systems must be tested in accordance with the approved commissioning report. DOOR OPERATIONS TEST FORM PROJECT NUMBER: BUILDING: ADDRESS: OPERATOR STAFF NAME: CONTRACTOR: CONTRACTOR TELEPHONE: SYSTEM INPUT A. Unlock Door 1. Fire alarm relay activated A. Unlock Door 2. Request to exit SYSTEM OUTPUT TEST RESULT DATE INITIALS INSTALLER: A. Unlock Door A. Unlock Door 3. Valid credential read 6. Latch monitor switch 5. Key override A. Turn Off Audible Alarm A. Initiate Timer 4. Delayed egress activated B. Audible Countdown C. Unlock Door D. Audible Alarm FIGURE 5: Example of a testing verification form that can be included as part of the documentation in the commissioning report.

Articles in this issue

Archives of this issue

view archives of ICT Today - ICT Today July_August_September 19