ICT Today

ICT Today October/November/December 2020

Issue link: https://www.e-digitaleditions.com/i/1284149

Contents of this Issue

Navigation

Page 38 of 79

October/November/December 2020 I 39 Use/Facility Type Recommended Distance Airport (Approach/Take-off corridors) 5 Miles Agriculture Uses (Grain Elevators, Livestock, Fertilizer/Machinery Storage) 5 Miles Automotive Body or Repair/Machine Shops/Gas Stations/Truck Stops 1 Mile Chemical Plants or Storage/Foundries/Conventional Power Plants 5 Miles Embassies/Political Groups/Large Urban Centers 3 Miles Landfills/Waste Storage or Treatment Plants 2 Miles Military Installations or Munitions Storage 10 Miles Nuclear Power Plants (Active) 50 Miles Overflow/Run-off Areas for Reservoirs or Man-made Lakes 2 Miles Quarries/Mines/Blast Zones 3 Miles Radio/Television Transmitters/Stations 3 Miles Research Laboratories 3 Miles Self-Storage Facilities 1 Mile following key considerations for addressing risk and ensuring security and protection, from site selection and physical security to thermal management and operations. SITE SELECTION CONSIDERATIONS Data center site selection has always posed its own chal- lenges with considerations that include both environ- mental and created outside influences, available utility services, and specific facility requirements. Because EDCs need to be located in a way that allows data to be processed close to users and network functionality to be performed in real time, site selection becomes even more critical. First, it is important to understand that there is no such thing as the perfect site, and any location can have some element of risk. It is also important to understand what those risks are for any location being considered for an EDC, as well as the potential risk introduced to the surrounding area as a result of its planned deployment. It is highly recommended to ensure the right support in the planning stages of the site selection by partnering with consultants with strong experience in this area. The key to selecting a site for an EDC is to weigh both environmental and manmade risks and decide if they are worthwhile investing in the site's development. Loca- tional criticality, business needs, costs, and implications to reliability or systems integrity should be considered in this process. Common environmental risks like severe weather, seismic activity and natural disasters can significantly affect operational continuity in even the most hardened of EDCs. For small, unmanned and/or only remotely monitored EDCs, it is more important to plan for and mitigate the potential exposure to the elements. Aside from natural occurrences, unexpected man- made risks outside the control of a site owner can also factor into site selection. Risks caused by adjacent uses, accidents, and potential acts of violence, theft or harm should be considered when evaluating a potential site location. In addition, the availability of skilled labor or support personnel capable of working to develop and maintain the EDC may also be a key factor to consider in site location. Having a good understanding of the potential risks, as well as understanding the potential for use and population changes around a site, can help better plan for those potential risks. For example, nearby hazardous conditions or manufacturing sites for hazard- ous products or materials could pose significant risk to the proposed site, as could adjacent travel corridors and proximity to civic, military or other socio-strategic locations. See Table 1 for recommended distances from adjacent facilities. TABLE 1: Recommended distances from edge data center sites to adjacent facilities.

Articles in this issue

Archives of this issue

view archives of ICT Today - ICT Today October/November/December 2020