Sport Rocketry

Sport Rocketry 2.2021

Issue link: https://www.e-digitaleditions.com/i/1345417

Contents of this Issue

Navigation

Page 41 of 47

Soyuz's BT-70 payload section and BT-60 transition would fit nicely atop the Sabre's BT-60 main tube. So now I had my design. The SLS has two SRBs, so the only extra parts I would need were some BT-20 tubes and nose cones. Cost: $4.80. Nice. So I started cutting, and this part was pretty simple. Both rockets have a baffle and a tethering harness, so it was just a matter of where to cut. The Sabre has long strakes starting from the fins, so it would be easier to just cut above them. And I learned that it is better to cut too little than too much; you can always prune later. I did my measurements and began separat- ing the components. I then peeled the tube paper off the couplers and baffles, sanded 'em down, and began test fitting. The BT- 70 payload section on the Soyuz was a lit- tle long for the SLS look, so I cut it down by 1½ inches. But things were already tak- ing shape. Then I began trimming down the four fins on the Sabre. I thought about leaving them as they were, but I didn't like the look of them with the new SRBs. Besides, leav- ing them their original size would make the new rocket very overstable. A simula- tion of the new design allowed me to use four tiny fins. They were a fraction of the Sabre's fins, so I cut out a fin template and marked them on the originals. You can see the size difference in the photo. So this meant a lot of cutting and sanding. This part of the rebuild was by far the most tedious and time-consuming task. It was very difficult trimming just the right amount of fin material and removing the old glue. And I learned early here to use gloves! Once I had the fins cut down to ways the same: flush mount or standoffs? I used flush mount on an earlier SLS build, so I decided to use standoffs this time. Pretty simple, actually. It's just like making launch lug standoffs, and it makes align- ing the SRB tubes easy. Just draw a line on the main and SRB tubes their entire length and use them for lining up. I test-fitted the SRB nose cones and glued them in place. But before glueing the SRBs to their stand- offs, I made sure to paint everything first! Just tape off the attachment points for bet- ter glue adhesion. You can always touch up tight spots with a brush later. For painting the rest of the rocket, I 42 MARCH/APRIL 2021 SPORT ROCKETRY Smoothing the tube cuts with a sanding block. Checking that the sanded tube cuts are straight with a paper wrap. Above: The Sky Sabre fins were far larger than needed. The template shows the desired final size. This took a lot of cutting and sanding. Below: The new tiny fin size. The old fin root attachment areas were difficult to smooth down, but these will be hidden with roll patterns. size, I airfoiled them and added some re- inforcement beads. I never did get a really clean look, so I decided to hide the imper- fections by covering them with the black part of the roll pattern. I also had to cut off the old launch lugs since the new rocket would need the Soyuz's standoffs for the wider payload section. For the SRBs, the question for me is al-

Articles in this issue

Archives of this issue

view archives of Sport Rocketry - Sport Rocketry 2.2021