40 I ICT TODAY
FIGURE 6: The main distribution frame (MDF) is in the MDC, which is a large commercial office building. The MDC
occupies the 3rd floor in this building. Image is courtesy of the Union County Chamber of Commerce.
FIGURE 7: Shown is the aerial view of the massive TRC campus. Circled is the US33 Telecom Building shown larger in the
right-hand image. It is the termination location for the Phase 1 and Phase 2 cabling backbone infrastructures.
(Photos provided with permission and courtesy of TRC Inc.)
Installing a redundant backbone loop began with
the construction of the Primary Route (Phase 1), mostly
along the shoulder of US33 from the Metro Data Center
(MDC) in Dublin, shown in Figure 6, to the TRC in East
Liberty (Figure 7).
Both the Phase 1 and Phase 2 backbones were cabled
as home runs between the MDC and TRC locations. The
Local Route (Phase 2) followed a parallel path to US33
on various state and county roads, as well as passing
through the center of the city of Marysville and parts
of the city of Dublin.
The US33 Telecom Building in Figure 7 serves
as a small data center. It has two rooms and 19 data
cabinets for current and future network and electronics
to run the CAV systems. There will be more optical fiber
connections to this building in the future.