ICT Today

ICT Today April/May/June 2021

Issue link: https://www.e-digitaleditions.com/i/1347119

Contents of this Issue

Navigation

Page 39 of 67

40 I ICT TODAY FIGURE 6: The main distribution frame (MDF) is in the MDC, which is a large commercial office building. The MDC occupies the 3rd floor in this building. Image is courtesy of the Union County Chamber of Commerce. FIGURE 7: Shown is the aerial view of the massive TRC campus. Circled is the US33 Telecom Building shown larger in the right-hand image. It is the termination location for the Phase 1 and Phase 2 cabling backbone infrastructures. (Photos provided with permission and courtesy of TRC Inc.) Installing a redundant backbone loop began with the construction of the Primary Route (Phase 1), mostly along the shoulder of US33 from the Metro Data Center (MDC) in Dublin, shown in Figure 6, to the TRC in East Liberty (Figure 7). Both the Phase 1 and Phase 2 backbones were cabled as home runs between the MDC and TRC locations. The Local Route (Phase 2) followed a parallel path to US33 on various state and county roads, as well as passing through the center of the city of Marysville and parts of the city of Dublin. The US33 Telecom Building in Figure 7 serves as a small data center. It has two rooms and 19 data cabinets for current and future network and electronics to run the CAV systems. There will be more optical fiber connections to this building in the future.

Articles in this issue

Archives of this issue

view archives of ICT Today - ICT Today April/May/June 2021