measured force vs. time of a lower and up-
per stage motor, in this case a C6-0 to a
B6-4.
There's less than a 0.2 second delay be-
fore the upper stage ignites, and I've found
from other static test data sets that the dis-
tance between the motors doesn't affect
this time delay very much.
I also conducted some static tests of
a gap stage ignition event, shown in Fig-
ures 4 through 27. [Editor's note: This ar-
ticle has been edited for space, as many of
the photographs submitted for Figures 4
to 27 were nearly identical and contained
SPORT ROCKETRY SEPTEMBER/OCTOBER 2021 41
ARMAGEDDON
TEXAS PRIDE
DEFENDER
WASP
ARROW
MANATEE
ARCH-BLAST
CONDOR
LAZARUS
SCORPION
PREDATOR
GIMLET
DART
SONIK BLAST
Mini - SONIK BLAST
Mini - ARMAGEDDON
NEW ROCKET KITS
COMING SOON!
361-212-7951
SHOP ONLINE
We're Back!
with our original lineup
COMING
SOON!
Figure 2. Vent holes relieve the
pressure from hot gas expelled
by the zero-delay motor and
prevent the stages from separating
until the upper stage motor
has ignited.
Figure 3. Static thrust stand data
of a minimum diameter gap stage
event using an Estes C6-0 to an
Estes B6-4. The spike at 8 seconds
is the ejection charge of the
upper stage.