Tablets & Capsules

TC0319

Issue link: https://www.e-digitaleditions.com/i/1087673

Contents of this Issue

Navigation

Page 26 of 51

Tablets & Capsules March 2019 25 • Any demonstration studies required • Supply-chain and cold-chain logistics, if applicable • Training requirements At this stage, the initial project team should also include the subject matter experts and ad hoc personnel required at both the sending and receiving units to suc- cessfully conduct the transfer. Next steps Once the tech transfer plan is in place, the next steps are to: 1. Execute the transfer Execution usually starts with transferring or ordering materials, analytical supplies, and equipment/parts, fol- lowed by analytical method transfer or validation and lab-scale or process scale-up studies, if required. 2. Qualify the process Process qualification usually corresponds to the valida- tion of the processes and the manufacture of the first marketable units. 3. Finalize the transfer Once you've validated the manufacturing and packag- ing processes and have the approved validation report, the final step is to wrap up the tech transfer documents with a tech transfer report. The tech transfer report will assess if the transfer has successfully adhered to the time- line and budget and whether the technology at the receiving unit has performed as expected. For example, if there was an unplanned need to change specifications or use a different grade of raw materials, you should list it First, the risk assessment will be part of the tech trans- fer plan and, like the tech transfer plan, is a live document. You will have approved an initial risk assessment at the beginning of the project, but both your knowledge and the risks will evolve as you deploy the transfer activities. Second, it's very important that both the sending and receiving units contribute to the risk assessment. While you can identify the risks based on a review of the documents, you should also ensure that subject matter experts from both the sending and receiving units meet to discuss them. Tech transfer plan As previously mentioned, the tech transfer plan con- tent is similar to that of the tech transfer charter/pro- posal, but the items are addressed in greater detail. The ISPE good practice guide states that a tech transfer plan should include the following: • Scope and objective • Resources and budget • Timeline and milestone dates • Roles and responsibilities • Deliverables and acceptance criteria • Assumptions, constraints, and risks • Detailed risk mitigation plan to address items identified in the gap analysis • Work plan and goals for the tech transfer process • Work plan and goals for development studies at either the receiving unit or the sending unit • Equipment details Figure 3 Example side-by-side process comparison *Note: I've changed the logo description and tablet strength to maintain the confidentiality of the product. Sending unit Receiving unit Pre-blend Order of addition, quantities, hand versus automated mixing and screening, screen size, type and size of equipment, mixing time. Blending For each blending step: order of addition, ingredient quantities, screen size, mixing time, mixing speed. Compression Model and make of tablet press, compression, speed range, description of logo on both sides. Pre-blend Screen Excipient A and Excipient B through a #12 mesh screen using a Sweco screener. Blend both for 5 minutes in a 10-cubic-foot V-blender. Blending Screen Excipients C and D and API through a #12 mesh screen using a Sweco screener. Add Excipients C, D, and pre-blend between two equal parts of API. Mix for 10 minutes in a 60-cubic-foot V-blender with intensifier bar operating. Compression Compress tablets on a Korsch XL400 tablet press at 42-50 rpm (88,200-105,000 tablets per hour). Tablet core is a 3/8-inch round, flat, beveled tablet with a "C" logo embossed on one side and "250" on the reverse*.

Articles in this issue

Archives of this issue

view archives of Tablets & Capsules - TC0319