Issue link: https://www.e-digitaleditions.com/i/1283117
nesium alloy. This one-piece, hollow fin assembly would be held to the rocket motor case by six socket head cap screws. The fin design consisted of four conventional double-wedge blades with a 55° swept leading edge. The fin assembly is made by forming the blades in four quarter-section panels welded together along each leading edge, tip, and trailing edge to form a single, fixed fin as- sembly. The blades are preset for a particular roll rate, thereby elim- inating manual fin adjustments during final assembly. In April 1963, the Fran- gible Arcas fin assembly was adapted to a standard Arcas vehicle and successfully flight tested at Eglin AFB. In turn, this fin assembly design was successfully used on the Fran- gible Arcas diagnostic and sys- tems vehicles launched at Pa- cific Missile Range. Payload Section The payload section con- sisted of a parachute container and the standard Arcas secant ogive nose cone. Essentially the same assembly as one used on a standard Arcas, the Fran- gible Arcas payload section did contain a few modifications to the parachute attachment ma- terial and connection locations to provide a low kinetic energy level upon impact. SPORT ROCKETRY SEPTEMBER/OCTOBER 2020 21 Project Manager George Oss standing next to display vehicle. Diagnostic Test Flights Two diagnostic flight tests of the Frangible Arcas were launched to evaluate the general aerodynamic characteristics and flight per- formance. These vehicles were fundamentally the same as the sys- tem flight vehicles except for the omission of the fragmentation system. The first flight was launched on December 16, 1964, from San Nicolas Island and the second flight was launched at Pt. Mugu on January 20, 1965. Flight data was analyzed to determine an accurate drag curve for predicting future flight performance. Motor case skin tem- peratures during flight were also monitored for determining the Side by side comparison with standard ARCAS.

