4
2
Sewer Lines Cleaning Footage
CCTV Footage
Valves Exercised
Fire Hydrants Maintained
Water Systems Site Inspections (45 sites)
Sewer Hot Spots Cleaned (5)
Water Mains Flushed
Cross Connection Control Inspections
Infrared Camera MCC's
FOG Inspections
Sewer Lift Station Inspections
Valve Replacement
Pressure Reducing Stations Maintenance
Reservoir - Coating & CP Dive Inspection
Pump/Motor Maintenance/Recondition
# Completed Maintenance Task Goal
PREDICTIVE
+
Preventive
MAINTENANCE
HIGHLIGHTS
Padre Dam is dedicated to ensuring that the highest
quality water is always flowing to our customers.
The unique area that Padre Dam serves includes significant elevation changes that
adds stress to the water transmission system, requiring additional pumping stations
and complex maintenance efforts. Even with the added challenge, Padre Dam's
dedicated operations team ensures water services are rarely interrupted. A flexible,
cross-trained staff help us to continue to meet goals.
infrastructure
system.
Our talented service teams conduct
regular maintenance of the District's
$700M
2020 Annual Report
13
MAINTENANCE