PADRE DAM

Padre Dam 2020 Annual Report

Issue link: https://www.e-digitaleditions.com/i/1337905

Contents of this Issue

Navigation

Page 13 of 23

INVESTING IN Infrastructure Potable Water Condition Assessment Aging infrastructure maintenance in order serve our customers. Utility owners, including are faced with aging underground infrastructure, limited and competing priorities. continue to age, it is necessary repairs to our drinking To achieve this goal, Padre completing pipeline assessments identify the status of the water distribution system. prioritized for condition based on a risk model, condition assessments select pipes. Finally, this used to identify high further, more detailed Results from these assessments help to prioritize repair projects that the District work to complete in the near and long term. Mountain View Connector Pipeline Padre Dam's Eastern Service Area has historically been served by a single water supply pipeline, with water conveyed west to east through a series of pump stations and reservoirs. Padre Dam is working to construct a series of secondary water pipelines parallel to the existing system, which will improve water supply reliability and operational exibility. The rst phase was the completion of the Eastern Service Area Secondary Connection project. The Mountain View Connector Pipeline project is the second phase in creating a parallel transmission system to our Eastern Service Area. This project involved installing approximately two miles of new 16-inch diameter ductile iron pipe along Mountain View Road, Frances Road and Harbison Canyon Road in Crest. The new pipeline went into service in the summer of 2020 and provides additional water supply resiliency to customers in the Eastern Service Area. Engineering/ Capital Improvement Program (CIP) Modern, reliable, and sustainable infrastructure is important to our communities. The District's infrastructure not only connects our communities, but also drives our economy and keeps us healthy and safe. Our Capital Improvement Program is the foundation of the District's long-range capital investment and nancial planning and prioritizes projects to ensure safe and reliable water and sewer facilities. During scal year 2020, the Engineering team conducted planning and feasibility studies for identied infrastructure improvements, managed design and construction of a new water pipeline, assessed the condition of aging water pipelines and made improvements to the Ray Stoyer Water Recycling Facility. 2020 Annual Report 14

Articles in this issue

Links on this page

view archives of PADRE DAM - Padre Dam 2020 Annual Report