CIP Project Highlights
Water Pipeline
Assessment
requires ongoing
order to continually
customers.
including Padre Dam,
underground
nancial resources,
priorities. As pipelines
necessary to prioritize
drinking water system.
Padre Dam is
assessments to
the District's drinking
system. Pipelines were
condition assessments
model, then lower-cost
assessments were performed on
this information was
risk pipelines for
direct inspections.
assessments will
repair and rehabilitation
District will
the
Ray Stoyer Water
Recycling Facility
Improvements
Constructed in 1962 and last expanded
in 1997, the Ray Stoyer Water Recycling
Facility (WRF) converts wastewater
into approximately 2 million gallons
of recycled water every day.
The recycled water produced at the WRF
lls Santee Lakes and is used to irrigate
parks, schools, and streetscapes.
Recent improvements were made to the
sludge collection equipment and clear
well. The work included
demolition of
the existing sludge collection equipment,
repair of damaged concrete surfaces,
installation of the new equipment, and
testing and commissioning of the new
equipment. Prior to this project, most of
the sludge collection ights and gears
system were original equipment from
when the WRF was constructed in the
1960s. This equipment has far exceeded
its useful service life. These improvements
help to ensure the safe and reliable
operation of the WRF.
Temporary Sewer
Flow Monitoring
As part of ensuring safe
and reliable sewer collection
services, the District conducts
sewer flow monitoring to verify
system capacity and to gauge
overall performance of the
collection system.
This is achieved by performing
temporary sewer ow monitoring in
the eld to measure typical dry
weather and peak wet weather ows
to help identify areas that may be at
risk of overows. Flow monitors were
installed at
25 sites in approximately
eight weeks from February to April.
Rainfall was measured by
seven rain
gauges distributed throughout the
sewer service area. Seven rainfall
events were captured ranging in
intensity and duration, with
precipitation unusually high for the
ow monitoring period, measuring
between
320 and 380 percent
above historical averages. The
results of the study will be used to
identify future infrastructure
improvement projects.