PADRE DAM

Padre Dam 2020 Annual Report

Issue link: https://www.e-digitaleditions.com/i/1337905

Contents of this Issue

Navigation

Page 12 of 23

732,327 116,245 3,705 1,288 1,541 243 387 255 132 142 102 50 10 4 7 604,000 60,000 2,700 720 1,000 264 220 209 148 116 104 132 9 4 2 Sewer Lines Cleaning Footage CCTV Footage Valves Exercised Fire Hydrants Maintained Water Systems Site Inspections (45 sites) Sewer Hot Spots Cleaned (5) Water Mains Flushed Cross Connection Control Inspections Infrared Camera MCC's FOG Inspections Sewer Lift Station Inspections Valve Replacement Pressure Reducing Stations Maintenance Reservoir - Coating & CP Dive Inspection Pump/Motor Maintenance/Recondition # Completed Maintenance Task Goal PREDICTIVE + Preventive MAINTENANCE HIGHLIGHTS Padre Dam is dedicated to ensuring that the highest quality water is always flowing to our customers. The unique area that Padre Dam serves includes significant elevation changes that adds stress to the water transmission system, requiring additional pumping stations and complex maintenance efforts. Even with the added challenge, Padre Dam's dedicated operations team ensures water services are rarely interrupted. A flexible, cross-trained staff help us to continue to meet goals. infrastructure system. Our talented service teams conduct regular maintenance of the District's $700M 2020 Annual Report 13 MAINTENANCE

Articles in this issue

Links on this page

view archives of PADRE DAM - Padre Dam 2020 Annual Report