PADRE DAM

Padre Dam 2020 Annual Report

Issue link: https://www.e-digitaleditions.com/i/1337905

Contents of this Issue

Navigation

Page 14 of 23

– CIP Project Highlights Water Pipeline Assessment requires ongoing order to continually customers. including Padre Dam, underground nancial resources, priorities. As pipelines necessary to prioritize drinking water system. Padre Dam is assessments to the District's drinking system. Pipelines were condition assessments model, then lower-cost assessments were performed on this information was risk pipelines for direct inspections. assessments will repair and rehabilitation District will the Ray Stoyer Water Recycling Facility Improvements Constructed in 1962 and last expanded in 1997, the Ray Stoyer Water Recycling Facility (WRF) converts wastewater into approximately 2 million gallons of recycled water every day. The recycled water produced at the WRF lls Santee Lakes and is used to irrigate parks, schools, and streetscapes. Recent improvements were made to the sludge collection equipment and clear well. The work included demolition of the existing sludge collection equipment, repair of damaged concrete surfaces, installation of the new equipment, and testing and commissioning of the new equipment. Prior to this project, most of the sludge collection ights and gears system were original equipment from when the WRF was constructed in the 1960s. This equipment has far exceeded its useful service life. These improvements help to ensure the safe and reliable operation of the WRF. Temporary Sewer Flow Monitoring As part of ensuring safe and reliable sewer collection services, the District conducts sewer flow monitoring to verify system capacity and to gauge overall performance of the collection system. This is achieved by performing temporary sewer ow monitoring in the eld to measure typical dry weather and peak wet weather ows to help identify areas that may be at risk of overows. Flow monitors were installed at 25 sites in approximately eight weeks from February to April. Rainfall was measured by seven rain gauges distributed throughout the sewer service area. Seven rainfall events were captured ranging in intensity and duration, with precipitation unusually high for the ow monitoring period, measuring between 320 and 380 percent above historical averages. The results of the study will be used to identify future infrastructure improvement projects. 2020 Annual Report 15

Articles in this issue

Links on this page

view archives of PADRE DAM - Padre Dam 2020 Annual Report