ICT Today

ICT Today July/August/September 2022

Issue link: https://www.e-digitaleditions.com/i/1472963

Contents of this Issue

Navigation

Page 14 of 65

July/August/September 2022 I 15 FIGURE 9: Primary AV stand fit-check prototype. Photo courtesy of Nottingham Trent University. FIGURE 10: Primary AV stand equipment bay. AV Stand Custom Housings Once the team had a handle on the quantity, physical dimensions, and internal cabling requirements of all the AV system electronic units, they needed to design the physical stands to house these units. In addition to having an equipment bay that would accommodate service access, cable routing, and equipment cooling, the stands needed a stable base to ensure they were not top heavy or prone to tipping. The stands also needed an aesthetically pleasing, permanent appearance, yet be easily moveable. With the fall semester quickly approaching, time was of the essence. The team engaged a Nottingham based full-service metal fabricator with many years of experience designing and manufacturing for the AV, healthcare, and corporate furniture markets. In consultation with all stakeholders, a design and fit-check prototype was created. A complete system was integrated on-site at NTU. This included all items to provide a true feel for the final solution to reduce risk. The prototype met all requirements, and full-scale fabrication production of the stand enclosures proceeded on an accelerated schedule (Figures 9 and 10).

Articles in this issue

Archives of this issue

view archives of ICT Today - ICT Today July/August/September 2022