Network Cabling Solutions

LITPDNCS Rev4

Issue link: http://www.e-digitaleditions.com/i/137513

Contents of this Issue

Navigation

Page 222 of 246

Network Cabling Solutions Appendix Shielded Jack Installation Instructions continued 8. Once cables are in desired placement, untwist pairs (a) and pull into place through bottom of manifold (b). If desired, trim the cables leaving at least ΒΌ" of wire from manifold side, prior to insertion into tool. a 10. Squeeze handles of tool to cut, terminate and seat manifold onto jack body. Release handles and pull jack from tool. b b a 11. Fold shielding back over jack manifold. Trim or fold foil to stay within manifold outline. Reflective side of foil needs to be on top. Top Bottom 9. Place jack body in tool with RJ45 opening down and black tab facing away from handles. Insert manifold, bottom (split-pair side) towards jack body. For product information visit www.hellermann.tyton.com or call 800.537.1512 221

Articles in this issue

Links on this page

view archives of Network Cabling Solutions - LITPDNCS Rev4