PADRE DAM

2015 Annual Report

Issue link: https://www.e-digitaleditions.com/i/680358

Contents of this Issue

Navigation

Page 12 of 23

Predictive and Preventive Maintenance ~ Padre Dam is dedicated to ensuring that the highest quality water is always flowing to our customers. Our talented service teams conduct regular maintenance of the District's more than $700 million infrastructure system. The unique area that Padre Dam services includes significant elevation changes that add stress to the water transmission system, necessitates additional pumping stations and requires complex maintenance efforts. Even with the added challenge, Padre Dam's dedicated operations team ensures water services are rarely interrupted. MAINTENANCE Highlights 606,956 70,681 3,850 1,408 1,064 531 320 144 131 118 100 70 9 3 10 100 % 98% 143% 196% 128% 108% 67% 60 % 89 % 109 % 96% 63% 100 % 75% 167% ( 604,000 ) (72,000 ) (2,700 ) (720 ) ( 832) (492) (480 ) (240 ) (148 ) (108 ) (104) (112) ( 9 ) (4) ( 6 ) Sewer Lines Cleaning Footage CCTV Footage Valves Exercised Fire Hydrants Maintained Water Systems Site Inspections Sewer Hot Spots Cleaned Water Mains Flushed Cross Connection Control Inspections Infrared Camera MCC's (Motor Control Centers) FOG (Fats, Oils and Grease) Program Inspections Sewer Lift Station Inspections Valves Replaced Pressure Reducing Stations Maintained Reservoir Dive Inspections Pumps / Motors Reconditioned # Completed Maintenance Task % ( Goal ) ~ 13 2015 Annual Report

Articles in this issue

view archives of PADRE DAM - 2015 Annual Report