80 PBE January 2016 Prevent ignition sources A dust explosion can't occur unless an ignition source, such as a spark, heat, or an open flame is present, so preventing such ignition sources is critical to reduce your dust explosion risk. Static electricity. Plastic or rubber belt conveyors or plastic surfaces in contact with flowing bulk solids will build up an electrostatic charge. Electrostatic discharges may occur without being visibly apparent because of high ambient humidity. You can easily check for electrostatic charge using an inexpensive, hand-held meter. If your conveyor is developing high electrostatic charge, you may need to install a grounded static-control brush near the moving belt to passively neutralize the charge using induction. In some cases, you may need to install an air ionizer to actively neutralize the charge. Pneumatic conveying and dust collection piping or ductwork can also build up electrostatic charge, which can be enhanced by dry conveying air and degradation of the material being conveyed. Piping runs must be properly grounded and have electrical continuity between pipe sections to prevent electrostatic buildup. Pipe sections are typically joined using either a clamp coupling, flange, compression fitting, or other clamp type, such as a Tri-clamp or Victaulic clamp. The external clamp coupling, as shown in Figure 1, is one of the simplest and most popular methods for connecting pipe sections. The clamp coupling wraps around two butt-end sections of pipe or tubing like a splint. Bolts along the clamp's longitudinal flange tighten the clamp and secure the two pipe sections. A rubber gasket along the clamp's entire inner surface makes an airtight seal. To prevent electrostatic buildup between joined pipe sections, an external clamp coupling includes an internal grounding strap that runs through the coupling and contacts both pipe sections. If you need to open a pipe connection to clear a clog or correct a leak, ensure that the grounding strap is properly reinstalled, or the gasket could electrically isolate the two pipe sections from each other, creating the potential for static buildup. Also, if the pipe sections are subject to axial or lengthwise movement, some of the conveyed material could become trapped between the internal conductive strap and the pipe and act as an insulator. Flanges, compression fittings, Tri-clamps, and Victaulic clamps also work well in pneumatic conveying systems, but these methods all require a mating gasket or ring between two flanged pipe faces. Flange bolts or flange clamps made of conductive metal can provide electrical continuity between pipe sections. For all coupling types, I'd advise using a conservative "belt and suspenders" approach to ensure continuity between pipe sections. The belt and suspenders approach uses a

Articles in this issue

Links on this page

view archives of Powder and Bulk Engineering - PBE0116