Powder and Bulk Engineering

PBE0116

Issue link: https://www.e-digitaleditions.com/i/623533

Contents of this Issue

Navigation

Page 84 of 125

dZ^}o]•&o}ÁƉŒš• If you have a Particle, We can Characterize it Getting it Right the First Time We are dedicated to providing cost effecŸve engineered soluŸons based on the measurement of key material flow properŸes. We can combine material flow property tesŸng with nearly 40 years consulŸng experience to solve any flow vZvo]vP‰Œ}ou•(]vPš}Ç[•‰Œ}µŒ•}(.v‰}ÁŒ•vPŒvµo•X tZÀ^}oÀ WŒ}ou•Á]šZW • DegradaŸon • SegregaŸon • ErraŸc Flow • l]vP • K+r^‰WŒ}µš • ^Ç•šu&]oµŒ • ^Ç•šuWoµP • ov]vP/••µ• • ^orµ‰ µ • š } u • ]P v • ooµ•W=írïñîrïóõrôôóõ Visit us: www.mažlowsol.com If your operation receives bulk deliveries by railcar or truck, check the condition of the railcar or truck piping and monitor the piping regularly for leaks while discharging material into your site's storage systems. Railcar or truck piping can be exposed to vandalism, damage during transit, and theft of metal components for the metal's salvage value. Ensure that bin vents are securely attached to hoppers and periodically check connections and openings to hoppers, vessels, and equipment containing combustible dust. Ensure that any bolted access hatches have all bolts in place and replace any gaskets that appear damaged or brittle or that show signs of dust leakage. Ensure that dust collection systems are compliant and properly maintained Existing dust collection systems handling combustible dusts should comply with the NFPA 68 explosion venting standards. A dust collection system installed before NFPA 68 became effective as a standard (in March 2008) is exempt from the explosion venting requirements under Section 1.5 (Retroactivity). However, an authority having jurisdiction (AHJ), such as the fire marshal or state inspector, could still require dust explosion venting or prevention if the AHJ determines that the existing system presents an unacceptable degree of risk. Also, if you're making significant changes to the original design or process, you must bring the existing dust collection system into compliance with NFPA 68. Some examples of significant changes are: • Major replacement or renovation of existing upstream or downstream equipment • Filter element design changes, such as replacing bag filters with cartridge filters • Control changes • Material feedrate changes • Ingredient or composition changes to the material being conveyed 83 PBE January 2016 When receiving material deliveries by railcar, ensure that all components of the railcar's pneumatic piping are present and in working order.

Articles in this issue

Links on this page

view archives of Powder and Bulk Engineering - PBE0116