Powder and Bulk Engineering

PBE0720

Issue link: https://www.e-digitaleditions.com/i/1263839

Contents of this Issue

Navigation

Page 18 of 51

July 2020 / 17 mal design parameter range) for pneumatic conveying technology. This system also allowed for better dust emission control than option 1, and while maintenance would be required on the system's parts due to the material's abrasive nature, the maintenance would be localized to a few specific components that are relatively quick to change. The OPEX estimate details for both options were gathered, as shown in Tables II and III. For Option 2. The dilute-phase pneu- matic conveying system consisted of a positive-displacement blower, two vibratory feeders feeding the material into two extreme abrasion- resistant rotary airlocks, and the subsequent pipeline, as shown in Figure 2. This option also carried the material into the same HPGR feed silo from option 1. This system was selected because the material capacity and plant layout were in the "sweet spot" range (the opti- dust emissions since the material contained toxic silica fumes. This conveying system was also studied to standardize or increase common- ality of equipment throughout the plant, which is always an important factor to keep in mind. Lastly, given the very high material tempera- ture, a chain bucket elevator was required with a specialized extreme abrasion-resistance chain, which can withstand higher temperatures than belt elevators. TABLE II Option 1 estimates Item Installed quantity Rebuild/ Change cost Workhour estimate Labor hourly cost Annual frequency Total OPEX per year Chain and buckets 1 $44,700 540 $125 0.35 $39,300 Conveyor belt 2 $12,600 72 $125 0.10 $4,300 Transfer chutes 3 $2,500 16 $125 1.00 $13,500 Conveyor pulleys sets 2 $5,000 80 $125 0.10 $3,000 Dust collector 1 $11,700 6 $125 0.25 $3,100 Power (kW) 60 $0.064* $33,200 Annual OPEX $96,400 CAPEX $1,840,000 *Cost of kilowatts per hour TABLE III Option 2 estimates Item Installed quantity Rebuild/ Change cost Workhour estimate Labor hourly cost Annual frequency Total OPEX per year Rotary valve 2 $30,000 12 $125 2.00 $126,000 Elbows 3 $2,700 8 $125 2.00 $22,200 Dust collector 1 $8,300 4 $125 0.30 $2,600 Power (kW) 98 $0.064* $54,400 Annual OPEX $205,200 CAPEX $1,008,000 *Cost of kilowatts per hour

Articles in this issue

view archives of Powder and Bulk Engineering - PBE0720